entity.lock_date.changed
The lock date of one of your business entities was set, moved, or cleared, from Kick or through the Platform API.
An entity's lock date decides which of its books can still change. When an accountant closes a period in Kick, writes your integration makes into it start failing with 409; when they reopen it, corrections become possible again.
This event tells your integration the moment the cut-off moves, so it can stop writing into a closed period instead of discovering it from failed requests.
When it fires
The event is sent once each time an entity's lock date changes: when it is set for the first time, moved to another day, or cleared. It fires the same way whether the change was made in Kick under Settings → Locks or through Locks, so a change your own integration makes reaches your endpoint too. Saving the date the entity already has is not a change, and sends no event.
Payload
{
"event": "entity.lock_date.changed",
"version": 1,
"occurredAt": 1760614200,
"payload": {
"entityId": "b6c4d2e1-7a3f-4c8b-9e0d-1f2a3b4c5d6e",
"workspaceId": "8d3a1b52-9f1d-4a7e-b0a1-2c5d6e7f8a90",
"date": "2026-09-30",
"previousDate": "2026-08-31"
}
}payload carries:
workspaceId
uuid
Workspace the entity belongs to
date
string or null
Lock date after the change, as YYYY-MM-DD. Null when the change unlocked the entity
previousDate
string or null
Lock date before the change, as YYYY-MM-DD. Null when the entity had no lock date
Comparing the two dates tells you which way the period moved:
previousDate
date
What happened
null
a date
The entity was locked for the first time, or again after being unlocked
a date
a later date
More of the books were closed
a date
an earlier date
Part of a closed period was reopened
a date
null
The entity was unlocked
The fields around it are the same on every event. See The event envelope.
Handling it
Treat date as the entity's current cut-off. Hold back journal entry writes and transaction updates, other than memo, dated on or before it, since Kick rejects them with 409. When the date moves earlier or is cleared, writes you held back for the reopened days can go through.
A delivery that fails is retried later, so a newer change can reach you before an older one. Compare occurredAt with the last event you applied for the entity, or read the current lock from Locks, rather than applying events in arrival order.
Last updated
Was this helpful?
